The challenge
Ben is a carpenter and Chloe is a registered nurse. They are 33 and 31, earn around $175,000 a year between them, and already owned their block of land outright, valued at $250,000. They wanted to build a new home on it under a $550,000 fixed price building contract, which would bring the completed value to roughly $800,000.
What they did not have was a clear picture of how a construction loan works compared to a standard home loan. When do progress payments go out? When does interest start being charged, and on what? They also wanted to use the equity in their land rather than find a separate cash deposit on top of what they already owned.
The timing mattered too. A fixed price building contract is only fixed once it is signed. They needed finance approved and ready before that point, so a change in rates or in their own circumstances could not put the price at risk.
What we did
Construction finance is a different product to a standard home loan, and the structure has to be right before anything is signed. We worked through it in this order:
- Assessed the land as their equity contribution, so no additional cash deposit was needed on top of what they already owned
- Compared lenders on construction loan policy specifically, including which lenders were familiar with their builder and would release progress payments in line with the stages set out in the building contract
- Secured a competitive interest rate on top of finding the right structure
- Structured the loan so interest was charged only on the funds actually drawn at each stage, not on the full $550,000 from day one, which kept costs down while the home was being built
- Arranged the valuations and inspections required at each stage, so funds were released to the builder as work was completed
- Had the loan approved and ready before Ben and Chloe signed their building contract, so they could lock in their price with confidence
The results
The $550,000 construction loan was approved, secured against their land equity and the $800,000 completed value. Combined borrowing sat at approximately 69 per cent of that value, comfortably under the 80 per cent threshold, so no Lender's Mortgage Insurance was payable.
Interest was charged only on funds drawn at each stage, reducing costs during the build. Progress payments were released in line with each construction stage, keeping the build on schedule. And because the loan was ready first, they signed their fixed price contract knowing the finance was already there.
Building a new home is a different process to buying an established one, and the finance needs to work the same way. By structuring the loan around progress payments and using the equity they had already built in their land, Ben and Chloe avoided unnecessary costs and had one less thing to worry about throughout the build. If you are weighing up building rather than buying, understanding how construction finance works before you sign a building contract makes the whole process far smoother.